climateprediction.net home page
Credits going up and down (not finished run)

Credits going up and down (not finished run)

Message boards : Number crunching : Credits going up and down (not finished run)
Message board moderation

To post messages, you must log in.

AuthorMessage
old_user3144
Avatar

Send message
Joined: 30 Aug 04
Posts: 50
Credit: 237,894
RAC: 0
Message 12826 - Posted: 24 May 2005, 11:13:32 UTC
Last modified: 24 May 2005, 12:01:50 UTC

Now things go really weird. My credit first got stuck with 4 trickles missing. Then, this morning i got credit for 2 trickles. Now 1 trickle is substracted from my credit and so finally still 3 trickles are missing.

[edit] And just right now with reporting the 5th trickle things sorted out and it's right again [/edit]
greetz, Uli

ID: 12826 · Report as offensive     Reply Quote
old_user2467

Send message
Joined: 28 Aug 04
Posts: 90
Credit: 2,736,552
RAC: 0
Message 12883 - Posted: 26 May 2005, 8:54:10 UTC
Last modified: 26 May 2005, 9:02:19 UTC

Things realy go weird. Look at this completed run:

<a href="http://climateapps2.oucs.ox.ac.uk/cpdnboinc/result.php?resultid=677468">Reult 677468</a>

Its completed... all trickles are received but credit is still wrong.

Or look at this result:

<a href="http://climateapps2.oucs.ox.ac.uk/cpdnboinc/result.php?resultid=768926">Reult 768926</a>

Its still running and has trickled 28 times. So it should have got 28*94.52=2646,49 credits... but result page is showing always 2457.46 indicating that two trickles weren't credited.

Ciao
ID: 12883 · Report as offensive     Reply Quote

Message boards : Number crunching : Credits going up and down (not finished run)

©2024 climateprediction.net